To merge a mixed system to the i-Vu Plus v6.0 application
Step 2: Update the files for controllers
1 Double-click the controller in the navigation tree or right-click and select
.
2 If you have multiple controllers of the same type, enable
Change for all control programs of this type?
.
3 Click
under
. A message appears
Changes the control program, view, driver and screen
files to use the current library version. Continue?
4 Click
When the message
Updated to the library version xx.
appears, click
5 Repeat steps 1 - 4 for any additional types of controllers.
6 Click
again.
Step 3: Update the files for CCN controllers
1 In the navigation tree, select the CCN device manager associated with the controllers that are to be updated.
2 Select the
tab and re-scan any controllers that need to be updated by checking
Rescan Controllers
Selected Below for Configuration Changes
and clicking
.
Step 4: Apply the update to routers and controllers
1 Select the site level in the navigation tree and then select the
page.
2 If you wish to apply the new SAL file to your entire system, you can use this page to compare to your
navigation tree and verify that you have selected all of your routers and controllers for download.
Only the CCN Gateway and device managers require download, so the CCN controllers/equipment will
not be listed.
3 A network's controllers download in the order shown. To change the order, select a controller(s), then drag
and drop or click
or
.
If a controller's router requires a download, it will download first regardless of its position on the
Download page.Click the
button.
○ Use
,
, or the
checkbox to select multiple controllers.
○ Up to 5 routers can download simultaneously.
4 See To download from the Downloads page in Help for more details.
i-Vu® Application Carrier Proprietary and Confidential CARRIER CORPORATION ©2014
Rev. 3/21/2014 All rights reserved
21
Comentários a estes Manuais